Survey & Geomatics

NE Loop Transmission Line

Project Details Fort McMurray and the surrounding oil sands area has experienced substantial industrial growth and as a result the need for improved infrastructure has become a major issue for most of the large projects taking place in the area. In particular, many of the oil sands projects have expressed concern that power demands will

Read More »

Red Chris 287kV Transmission Line

Project Details In November 2013 Rokstad Power Corporation began construction on BC Hydro’s 287kV Northwest Transmission Line project from Bob Quinn to Tatogga, BC.  CAP was hired as a subcontractor to help complete the installation of 263 self-supporting and guyed steel lattice towers designed and constructed in accordance with BC Hydro standards.  The transmission line

Read More »

Highway 831

PROJECT DETAILS This Alberta Transportation project included pavement rehabilitation and safety improvements on 30 km of Highway 831:10 from Hwy 661 to Hwy 63. The pavement rehabilitation included subgrade excavation and full width mill and replace to maintain the existing roadway width. Geometric improvements to six intersections and a safety rest area are proposed, including

Read More »

Highway 64

This Alberta Transportation project included pavement rehabilitation of 17.85 km of Highway 64:02 from the BC Border to 6 km east of Highway 717 as well as the safety rest area at km 1.4. The pavement rehabilitation included subgrade excavation, mill and fill transverse crack repair, spray patch and an asphalt overlay. Other miscellaneous work

Read More »

Drive your project to new heights.

Let’s achieve the remarkable, together.

Scroll to Top
Scroll to Top