DISCOVER BOLD ENGINEERING IN OUR FEATURED PROJECTS

Using Innovative Engineering Solutions and Cutting-Edge Technology to Make Real Impact

Filter by

  • Reset filter

Mariana Lakes Load Freer Substation

The Mariana Lakes Load Freer Substation project was established as a necessity to match the increase in demand of electricity around the Fort McMurray area. The Freer Substation project involved the installation of one 144kV circuit breaker, one 144/25 kV transformer and their associated equipment. We provided project management, survey, inspection, and quality assurance/control services for the substation.

Rycroft Substation Expansion

Fort McMurray and the surrounding oil sands area is experiencing substantial industrial growth and as a result, the need for improved substations has become a major issue for most of the large projects taking place in the area. We provided project management, surveying, inspection, and quality assurance/control services for the substation’s earthwork expansion.

Carcross Biomass

Biomass is renewable organic material that can be transformed into clean usable energy. A very common practice is to use biomass boilers in small scale heating systems which often burn wood chips, shavings, sawdust, and pellets to produce heat/energy.

Highway 831

This Alberta Transportation project included pavement rehabilitation and safety improvements on 30 km of Highway 831:10 from Hwy 661 to Hwy 63. The pavement rehabilitation included subgrade excavation and full width mill and replace to maintain the existing roadway width.

Nares River Bridge

The Nares River Bridge was built to replace the existing wooden bridge built in 1970 to accommodate mining activity in the area. The new bridge was required because the wooden bridge could not accommodate the large loads and demands of today’s vehicles.

Faro Mine

Parsons was awarded the contract by the Federal Government for the realignment of the North Fork of Rose Creek at the Faro Mine. The diversion of the creek was initiated to prevent contact between the creek itself and contaminated water seepage from the mine site.

Topsail Road Widening & Storm Upgrades Phase 4

CAP acted as prime consultant on this project and completed design for all underground civil works while our sub-consultant completed road alignment, bridge design and pedestrian lights.

Emera HVDC Maritime Link

Construction of access roads, foundations and anchors, tower assembly and erection, and conductor stringing for approximately 185 kmof 240kV DC transmission line between Newfoundland and Nova Scotia.

Alaska Highway Realignment – KM 742 to KM 750

Cobalt Construction Inc. was awarded the contract by Public Works and Government Services of Canada (PWGSC) for the realignment of the Alaska Highway from 742 km to 750 km.