DISCOVER BOLD ENGINEERING IN OUR FEATURED PROJECTS

Using Innovative Engineering Solutions and Cutting-Edge Technology to Make Real Impact

Filter by

  • Reset filter

Teck Coal Mine Reclamation

CAP's role on this project was to provide project controls support by developing reporting systems and tracking tools to successfully predict productivities and trends to determine scope creep and completion timelines and costs

GIS Substation Upgrade Project Washington (DC)

The project involves the upgrade and replacement of aging equipment and infrastructure.

Nisutlin Bay Bridge

The Nisutlin Bay Bridge is a critical link along the Alaska Highway and an important landmark for Teslin. Originally designed in 1953, the bridge is nearing the end of its lifespan and is being replaced.

CNRL Horizon Substation and Transmission Line Construction

As part of the expanded mining operations CNRL Horizon oil sands site, the entire power distribution grid within the CNRL site was required to the be relocated to allow for future exploration.

Kenmount Crossing Commercial / Industrial Development Phase 1 & 2

The project included design and construction of the internal road network, future signalized intersection with Kenmount Road, water and sanitary sewer servicing, storm sewer servicing and stormwater management including stormwater detention.

CNRL Horizon Substation Expansion

The CNRL Expansion project was established out of necessity to upgrade the current substation to match the current demand of electricity in the area. During the expansion, six 240 kV circuit breakers and two segments of 240 kV transmission line were added and connected to the existing system. We provide project management, inspection, and quality assurance/control services during the construction of the electrical infrastructure.

Highway 831:08/10 From Jct. Hwy 661 to Jct. Hwy 63

The project involved rehabilitation of Highway 831:08/10 including a mill and replace, sideslope improvements, intersection improvements and intersection lighting.

KZK Mine Camp Establishment

CAP Engineering (CAP) was retained by BMC Minerals to administer the design and construction of a new exploration camp and the Kudz Ze Kayah (KZK) Mine site, approximately 115km southeast of Ross River, YT.

Mariana Lakes Load Freer Substation

The Mariana Lakes Load Freer Substation project was established as a necessity to match the increase in demand of electricity around the Fort McMurray area. The Freer Substation project involved the installation of one 144kV circuit breaker, one 144/25 kV transformer and their associated equipment. We provided project management, survey, inspection, and quality assurance/control services for the substation.

Drive Your Project to New Heights